Rondo’s products were specifically requested in the design process for Australia’s most environmentally sustainable data centre in Malaga, Western Australia. Perth’s first and only carrier-neutral colocation Data Centre is designed and built with the latest data centre technologies to promote continuity for energy-efficient technology and security. P1’s construction timeline estimated 15 months to completion, allocating time for design reviews and adjustments. The initial door framing sections specified in the design plans were reviewed for the project’s construction.
Rondo Technical Sales Representative, Paul Bowden, worked with Complex Ceilings, along with the assistance of Rondo’s Technical Team, to specify a suitable option in the use of Rondo’s MAXIJamb® profile. Complex Ceilings expressed their satisfaction with the product and commented on its ease of installation. Rondo’s 92mm Stud and Track Wall Framing, and KEY-LOCK® Concealed Suspended Ceiling System were also selected for use on the project, which was officially opened in late February. Aussie Plastaboard supplied Rondo with exceptional quality and service throughout this project, with specific thanks to Dominic Crisoma and James Moore.